What do factory owners fear most? The production line suddenly lying down! Conveyor line selection is wrong, the light is to repair the machine every day to compensate for the hours of work, the heavy is the order of yellow compensation for liquidated damages. Don't panic, do ten years of production line planning of the old driver, today, out of my heart with you nagging -!Avoid these three big sinkholes and choose accordingly to save a decade!
▎Newbie must see: these pits to step on one will be finished
Pit 1: Saving the wrong money!
- negative exampleA chemical plant installed its own line to save 30,000 commissioning fees, but the drum was installed backwards, and the first batch of raw materials were all stuck--You must buy the package that includes 72 hours of on-site commissioning!
- lesson learned through blood and tearsSeafood factory did not do stainless steel anticorrosion cheap, half a year rust residue mixed into the goods, lose half a year of profit!Wet/corrosive environments must be coated with Detron nano-coatings.
Pit two: closed eyes punch “universal magic machine”
- scene of an overturned vehicle: Sales brags about “all-scene versatility,” only to have the food line stuffed into a mine and crumble in three days! Remember the mnemonic:
- Heavy Duty Select Jaguar/Shandong Mining Machinery(2 tons per meter, mine gravel measured and manufactured)
- Precision Workshop Punching Wei Chuang/De Chuang(±0.1mm error, automotive screw holes 100% alignment)
Pit 3: Ignoring energy labels
- Invisible Vampire: A logistics center bought inefficient motors on the cheap, and paid $380,000 more for electricity in a year.Recognize GB 30253 first-class energy efficiency standard(Breitbart Energy Saver with measured power savings of 15%)
▎ Scenario counterpart: copying homework and done with it
Scenario 1: Mining/steel/building materials plant (heavy-duty violent workshop)
- sore point: Ore slamming, steel coil pressing, 24-hour streak!
- blindfolded::
- Jaguar conveyanceSingle meter load capacity is 2 tons! Motor power consumption is low 15%, annual savings in electricity costs ≈ two maintenance workers!
- Shandong Mining Machinery: Mining area set up repair point, oil leakage coal leakage 2 hours to solve (coal mine market share of more than 50%)
- ContiTech (brand)German wire rope core to carry 4000N/mm tension, steel mill 90 ℃ high temperature according to run
Scenario 2: Automotive/Electronics/Lithium Battery Factory (High Precision Players)
- sore point: Parts are scrapped if they deviate by 0.5mm, and manual labor is slow and misses inspections!
- direct charge::
- Wei Chuang Automation::doubled speed chainSynchronization error ±0.1mm, old line renovation save 60% cost
- Detron Intelligence: AI alarm failure 3 days in advance, cell phone remote restart (cold chain -25 ℃ as silky smooth)
- Ding Feng Machinery: Specialization in shaped parts! Auto parts factories save $400,000 on customization
Scenario 3: Food/Chemical/Cold Chain Warehouse (Specialty Environmental Specialist)
- a lifesaver::
- Qingdao Global: Resistant to 260℃ coke! Rapid cold and heat does not crack (ordinary belt temperature difference of more than 50 ℃ will be deformed)
- Huihong Conveyor: Xinjiang frozen motor 24 hours across the province repaired, accessories prices official website full open
- Centennial: Energy saving and environmental protection documents are complete, the government spot checks do not panic!
▎ Avoiding the Pit Trifecta: Beaten to death to confirm before placing an order!
▶ Soul Torture Sales
- “Dare to sign a malfunction indemnity contract?”(For example, if the average daily breakdown is more than 1 hour, we'll pay double, and Phihong will dare!)
- “Can old equipment be retrofitted?”(Dingfeng Machinery 50,000 refurbished = new machine 80% performance)
- “Where do I put the energy label?”(No GB 30253 first-class energy efficiency standard? Directly pass!)
▶ Environment matching self-check sheet
| take | Required items | life-saving program |
|---|---|---|
| food factory | FDA Approval Documentation | Deltronics Intelligence is available free of charge |
| Mine dust area | Seal anti-leakage rate <0.1% | Zigong Transportation Machine Tubular Conveyor |
| Cold chain workshop | -25°C motor freeze test | Phihong Conveyor Test Report |
The old driver tapped the table and said
This conveyor line thing.It's just like finding a date - there's no such thing as the most expensive and best, only the most suitable!
- Small and medium-sized factories rush with closed eyesWei Chuang + Hui HongCombination, accuracy enough to use fast after-sales, save enough money to pay half a year bonus;
- Heavy Duty Workshop RecognitionShandong Mining Machinery, the mining repair point is more reliable than a real son;
- Specialty environments?Qingdao Globe High Temperature Resistant + Detron Corrosion ResistantThe government can cross their legs and drink tea when they come to investigate.
Dump the big truth at the end.Greedy cheap to buy the conveyor line, the money to repair the machine is enough to buy three new! Once the production line stopped, the whole factory cursed - this unjustified money we do not spend!