Shop to change doubler chain line - how to choose to avoid rework and cost?

All factory owners, production department in charge, is not often encountered such a problem: want to give the workshop for a new conveyor line, change, but the face of a variety of manufacturers, simply do not know where to start? Choose expensive for fear of waste, choose cheap and worry about not durable, affecting production, really difficult. In factconveying lineSelection is not so complicated, as long as you grasp a few core points, you can easily choose the right equipment for you. Today through thedoubled speed chainconveying lineThe selection of the key points to give you an understanding.

Images 1-5.png
I. Prioritizing load capacity

conveying lineThe first step, first figure out the line to transport materials, products in the end how heavy, how big the volume. If the selected conveying line load capacity is not enough to catch up with the peak season, the material piled up more, it is easy to cause production line failure, or is particularly unstable operation, when the time to stop production and maintenance, the loss can be big. Therefore, before selecting the type, we must calculate the product weight, single conveying capacity, to ensure thatconveying lineThe load capacity has to be left some margin over the expected demand so that you can use it with confidence.

Image 2-5.png
II. Setting speed according to production requirements

Conveying speed is very critical, not the faster the better, not the slower the more stable. If it is too slow, the previous process is done, the material can not be sent to the next station for half a day, the entireProduction line efficiencyDown, the workers are anxious, and the output can not go up. But if you run too fast, the material is not moving on top of the pile, and may even be blocked, falling, easy to rework frequently not to mention, but also cause great losses. So according to the specific rhythm of their respective production lines, such as assembly line how long each process takes, according to this time to match the conveying speed, to ensure that the material can flow smoothly, without delaying production.

Pictures 3-5.png
III. Combined space and process length layout

First is the length, how long the workshop can spare, how many processes the production line needs to cover, these have to be grasped in advance. Then it is the layout, whether to go linear, or circular, back to the shape, so that the material can be transported in a circular manner? All of these should be determined according to the process flow. In addition, some processes require materials higher, some need to be lower, how to arrange without additional changes to the layout of the workshop? This should also be taken into account.

Image 4-5.png
IV. Balancing durability, maintenance and cost-effectiveness

Selection of equipment can not only look at the moment, but also have to consider the long-term use. First of all, durability, you have to choose good quality, manufacturer's reputation of reliable equipment, so that fewer failures, do not have to stop often for maintenance, production efficiency can be guaranteed. Secondly, it is easy to maintain, it is best to choose the kind of easy to dismantle, easy to clean, usually maintenance is not difficult, their own workers can maintain, do not have to look for manufacturers every time the door. Finally is the cost-effective, not the more expensive the better, not the cheaper the more cost-effective. According to their own budget, calculate the cost of the equipment itself, as well as subsequent operation and maintenance costs, choose a reasonable price, performance and can meet the demand, which is called the real cost-effective.

Image 5-2.png
with respect toWei Chuang Automation

Overall, the selection ofSpeed Chain Conveyor LineThe main point is to focus on the “can carry, fast enough, adaptable, durable and cost-effective” several points, their own needs clearly, and then against the selection will be very difficult to make a mistake. If you still have any questions about the production scene do not understand, you can also leave a message below, we will help you solve one by one.