Analysis of the whole process of transferring used flexible equipment

Just entered the industry, Li boss spent 500,000 yuan to buy a second-hand flexible production line, the results of the transfer found that the equipment was mortgaged, the court directly seized -Money and goods!Guess what? In the second-hand trade.35%'s title dispute all due to process loopholes! Don't panic! Today, we'll dismantle the whole process of avoiding lightning.Save 30% cost + speed up 15-day delivery👇


I. Pre-preparation: one step less = ten buried mines

"Just as long as the equipment works? Big mistake!"Flexible equipment is most afraid of dark injuries and title pits, and these three documents are missing:

  1. Equipment ID: Photo of nameplate + factory number (Call the original hotline immediately to check the record! 2024 a case 30% nameplate forgery)
  2. proof of ownership: Purchase invoice + tax clearance certificate (Focus on mortgage records! (A factory lost $800,000 in a seizure due to missed inspections)
  3. health file: Three-year maintenance record + key component inspection report (Flex cable must see flex life test! <(<5 million dynamic bends = scrap warning)

Tears of blood case: Dongguan Zhang total save 200,000 to buy "no case" equipment, put into production on the day by the original lock machine - dismantling found thatMotherboard serial number does not match the nameplate, the rights are not available!

Self-checklist::

  • Does it exceed the design life of 80%? (If the design is 10 years, buy with caution if it has been in use for 8 years.)
  • Does it come with a list of accessories? (Price increase of 3 times at a later stage if the type of wearing parts is not clear)
  • Does the contract allow for a 7-day inspection period?(Dark Sickness Machine final escape door!)

Second, channel selection: three types of sellers hedge guide

Choosing the wrong channel = money down the drain! What's so special about flexible equipment?Spherical bearings and cable sheathing are the hardest hit by refurbishment.!

Channel Type mortal risk Flexible equipment exclusive countermeasures
change hands personally No after sales + unclear title Must check court seizure records + sign transfer agreement
buy (on behalf of sb) from overseas Tariff Stacking 30% + Parts Out of Supply Confirmation of domestic agent's spare parts pool (otherwise it would take 3 months to wait for spare parts)
Used dealers refurbish and pass off as good Ask for the ISO 14572 bend test report!

Golden Rule::
Preference for local stockistsOn-site inspection saves shipping costs, and after-sales response is 3 times faster (over 45 days for disputes in other places).
Locking of detachable equipment: A factory Amoy scrapped line dismantled 80,000 worth of servo motors, the cost of the whole machine straight down 60%!


Third, the contract minefield: black and white to lock up these 3 articles

Signing an agreement without these = waste paper! Flexible equipment is most often planted in this::

1️⃣"Dynamic Performance Warranty Clause"
  ▶ WriteNo-load noise ≤ 60dB(Exceeded standard ≈ bearing scrapped)
  ▶Shield coverage ≥85%(otherwise signal interference shutdown)

2️⃣Default daily compensation formula
  ▶ Compensation for suspension of production = average daily production value × 2 (a factory recovered $220,000 in losses by this article)
  ▶Flexible line special supplement: joint bearing warranty ≥ 1 year!

3️⃣Clean Title Commitment
  ▶ "The seller guarantees that there are no mortgages or seizures, otherwise the deposit will be returned three times."
  ▶High resolution image with device serial number(anti-snare!)

With the words:
"Mr Chen, why don't you attach the customs duty payment slip and bearing replacement record to the contract attachment? After all, flexible equipment eats these two pieces the most!"
--This technique helped a certain price cut 15%.


IV. Delivery and acceptance: 4 steps to plug the final loophole

You think it's safe to sign the contract?30%'s Pit in the Acceptance Session!

Step 1: Delivery of on-the-spot title checks
  ▶ Check the status of your equipment on the National Movable Property Mortgage Registration System.
  ▶Highlights! Verify that the original serial number matches the contract

Step 2: Violent testing against dark diseases
  ▶Continuous Bending Test: 500 S-bends in 5 hours (direct return for joint noise)
  ▶Load Running Speed Test: Up to the design maximum speed of 120% operation (a factory did not test the loss of 180,000)

Step 3: List of documents to be delivered
  ▶ Original instruction manual + wiring diagram (without which the later maintenance fee is doubled)
  ▶ Warranty card + operator training video (to avoid damage from misuse)

Step 4: Final instalment payment
  ▶ Leave 20% final payment after 1 month of use (specialising in hidden faults)
  ▶Special terms for flexible lines: 3 days of trouble-free production at full capacity before billing


Exclusive data: the old hand's death-defying demotivation technique

▲ Cost Control Tips
  ▶Staggered purchases save 25%: Annual March Factory Upgrade Wave, Used Market Inventory Increases 40%
  ▶reorganisation method of disassembled parts: Amoy the same type of scrap machine assembled, the cost of the new machine 30% (an electronics factory test)

▲ Judicial Hazard Code
  ▶ Increased success rate in defending clear title equipment 76% (2024 White Paper on Secondhand Disputes)
  ▶ The contract states that "the place of arbitration is the location of the buyer" - the cost of local defence is reduced by 60%!

▲ Flexible equipment life formula
  ▶ Remaining life (years) = (10 million times - number of bends already made) / annual bending frequency
  ▶Example: has been bent 3 million times, annual frequency of 500,000 → remaining life = (1000-300)/50 = 14 years

Let's end on a positive note.: depth of water for used flexible equipment.It's not the price, it's the process.The first time I saw this, it was a very good thing that I was able to get it right! According to this set of steps, the rate of stepping on the pit is straight down 90%. turn to the friends who need it, saving a life is better than building a seven-level pagoda!


Data corroboration::
:: Practical guide to the movable property registry system (2024 judicial filings)
:: Standard for dynamic bending test of flexible cables (ISO 14572:2025)
:: Case study on delivery and acceptance disputes (Guangdong High Court 2024)
:: Used Market Inventory Fluctuation Report (East China Equipment Distribution Association 2025)
:: Statistics on the cost of defending title defective equipment (2024 Used White Paper)

Tags.

Related news