Xiao Wang, who has just taken over the task of upgrading the production line, stares at the purchase order on the180,000The multiplier chain offer is a cold sweat - why is this thing more expensive than a car? Save enough budget to give the team a half-year bonus! Don't worry, today we will break open the rubbing talk about the price of Yueyang speed chain conveyor doorway, hand in hand to teach you to avoid the pit death of the money.
First, the price fog: from 30,000 to 300,000, where is the difference?
Guess what? The same called "times the speed of the chain", Yueyang local factory offer can be 10 times different! Last week, the old Li factory installed assembly line only cost 50,000, the next workshop with the length of the equipment but reported 180,000 yuan. In fact, the key to see through these three points:
- The mystery of materialsCarbon steel or aluminium alloy for the shell? The former is cheap 30% but half a year to rust through, the latter is expensive to carry ten years (secretly tell you: take the magnet to suck the fuselage, sucked is the pit goods carbon steel)
- speed trick: Labelled "triple speed" may not be really fast! Have to look at the motor power - 5m line body with ≤ 1.5kW motor are rogue!
- Invisible Assassin: It's what's not on the quote that's the biggie! For example:
- Add 8000+ for inverter control
- The anti-static treatment of the work plate is more than 200 per piece.
- The most ruthless is the "commissioning fee", some manufacturers recover the total price of 30% afterwards.
Second, the latest price map in 2025 (Yueyang local actual measurement)
Running all over Yueyang Jingkai District factory squatting to the market, directly on the dry goods:
Configuration type | Applicable Scenarios | Price range (per metre) | Recommended Manufacturers |
---|---|---|---|
Economic carbon steel model | Temporary production lines/light duty materials | 2500-3500 yuan | Kwang Leung Intelligence |
Standard aluminium profiles | Electronics/appliances assembly line | 4800-6500 | DiOne Intelligence |
Heavy duty anti-fouling version | Food/chemical workshop | 9000-12000 | Jie Ming Electromechanical (Stainless Steel Chain) |
Intelligent integrated models | Automotive/new energy | 15,000 + | Yuan Sheng Intelligence (with PLC control) |
A case of blood and tearsYueyang, a packaging plant to choose a cheap 3500 yuan / metre of carbon steel line, the results of the sauce infiltration guide rust chain, half a year maintenance fee enough to buy a new line! And choose the Diyi intelligent aluminium profile line of the electronics factory, three years zero failure to save 60,000 maintenance fees.
Third, the newbie must pit guide: buy this way to save 100,000
Question 1: How do I communicate my customisation needs without getting ripped off?
Last month a car parts factory suffered a loss - did not state that the workshop has dust, as a result of the common bearing three days seized. Remember these 3 mandatory data:
- Kilograms of the heaviest workpiece (e.g. ≥50kg with thicker chain plates)
- Whether the humidity in the workshop exceeds 60% (to prevent rust plating)
- To link up or not to link up with a robotic arm (interface fee difference of 5000)
Question 2: How to break the selection kink?
Teach you a foolproof formula:
- Workpiece ≤20kg → Select belt line (cheap 40%)
- Pause in the middle is required → Double speed chain is mandatory (precision brakes for tooling boards)
- Wet environment → direct stainless steel chain (expensive but save money)
Fourth, maintenance saves half a line! Teacher never out of the magic trick
You know, the 90% chain scrapping is the maintenance of death! Learn these hands from Yueyang Mengniu factory's old Wu:
- (soup etc) of the day: Feel the temperature of the chain (stop when it exceeds 60°C).
- daily: Alcohol wipes the rails (don't use water! The conductive wheel will short-circuit)
- every month: Measurement of chain elongation (tighten immediately if over 2%)
- quarterly: Change of food-grade grease (50,000 penalty for contamination of production line by ordinary grease)
first aid kitSuddenly chain don't hard pry! First off the power supply, the work of the board is unloaded, manually disc drive wheel - last year, the open area electronics factory rely on this move to avoid 200,000 losses.
V. 2025 woolgathering strategy: this is the smartest way to make payments
Now Yueyang manufacturers are rolled crazy! Yuan Sheng smart to get out of the "first use and pay later" - test run 30 days before settlement; Guangliang smart more ruthless, sign a three-year maintenance contract to send a full set of toolkits. But remember to hold down the final payment at least 10%, after the rainy season and then pay - chain rust claims rely on this money backing.
In the final analysis, buying a multiplier chain is not a matter of price but of totalisation. Next door to the factory old Zhang's words are true: "Save enough maintenance fees to give workers a chicken leg, it does not smell good?" Next time you go to inspect the supplier, directly lift the bottom plate of the equipment to see the chain plating, than the sales blow what works - after all, the machine can not deceive people, right?